Energy & Risk Reduction Programme Case Study 5

Chile data centre (chilled water with cooling towers). Improvements were recommended in the following areas:
    Improve air management throughout the facility:

  • Take temperature readings for IT and cooling equipment
  • Establish levels of bypass, recirculation, negative pressure and air availability
  • Implement best practices –blanking plates, grille replacement to improve air flow, rotate backward facing equipment, cold aisle containment and sealing of cable holes.
    Improve PUE:

  • VFD fan installation
  • Optimise humidity control
  • Descaling of cooling plant
  • Lighting automation
  • Change set points of generator heaters
  • Improve teamwork –better communication between teams and improved excellence, quality and compliance.