Energy & Risk Reduction Programme Case Study 3

London data centre (DX glycol). Some energy saving best practices had already been targeted. Improvements were recommended in the following areas:
  • New UPSs to replace single unit
  • CRAC unit upgrades
  • Ultrasonic humidification (very low energy)
  • Implementation of 4 No. glycol pumps with VSDs, and lowering of fan speeds
  • New PMS (power monitoring system) Front End
  • Replace DAC (dry air cooler fans (condenser fans) with EC direct drive units
  • Replacement of 3 No. chillers because of R22 gas use