Case Studies

Energy and Risk Reduction Programme - Case study 4


Result

 

Brief

Target energy savings whilst managing risk at Swindon facility.

Recommended changes

  • Install blanking plates
  • Curtains (for containment) and return grilles to network rows
  • Reduce pressure set points
  • Seal gaps in aisles where cabinets are missing
  • Relocate poorly placed floor grilles
  • Cold aisle containment
  • Review scoop direction
  • Change cabinet doors to increase open area/airflow
  • Angled grilles
  • Improve processes for Colo installations